Skip to content

FDOT Standard Plans · FY 2026-27 · Series 102: General Construction Operations-Roadway

FDOT Standard Plans Index 102-660: Bicycle Lane Closure

Short answer

Index 102-660 is the FDOT Standard Plan for Bicycle Lane Closure, part of Series 102 (General Construction Operations-Roadway). The sections below are extracted from FDOT's Standard Plans Instructions (SPI) for this index — design criteria, assumptions and limitations, and what your plans must show.

Design Criteria

Design Criteria Manual on Uniform Traffic Control Devices ( MUTCD ) ; FDOT Design Manual ( FDM )

Design Assumptions and Limitations

Design Assumptions and Limitations See the Standard Plans Instructions for the 102 Series – Temporary Traffic Control (TTC) . Indexes 102-660 and 102-661 provide rudimentary typical applications for sidewalk closures and bicycle lane closures, respectively. The primary purpose of Indexes 102- 660 and 102-661 is to establish minimum requirements for work zone signs and channelizing devices, and include scenarios that complement the pedestrian and bicycle accommodation guidelines provided in FDM 240 .

Use these Indexes as a guide in establishing project specific pedestrian and bicycle accommodations in the TTC Plans. Index 102-660, Pedestrian Detour - Option 2 : • For locations where sufficient length of low-profile barrier cannot be provided, Longitudinal Channelizing Devices can be used. • This option should only be used when Option 1 is not feasible.

Payment

Payment Item number Item Description Unit Measure 102-4 Pedestrian and Bicycle Special Detour LS See the BOE and Specifications 102 for information on payment, pay item use, and compensation.

pedestrianworksidewalkclosedaheaddetourroadtemporarywhenclosuresignzone

How PDFDepth uses this index

When a plan set cites Index 102-660, PDFDepth's AI Plan Review cross-references the set against the Plan Content Requirements for the FDOT indexes it cites and flags items that appear to be missing — each with a citation to the sheet. A human reviewer verifies every flag before it counts.

Related indexes in Series 102

All FDOT Standard Plans indexes

Try it yourself — open your plan set in PDFDepth

Review, measure, and check plan sets against the standards they cite — free for 14 days.

Start for Free

Text extracted from FDOT Standard Plans FY 2026-27, a public-domain Florida state publication. Always verify against the current edition at fdot.gov. PDFDepth is not affiliated with FDOT.