FDOT Standard Plans Index 425-080: Utility Conflicts Thru Drainage Structures
Short answer
Index 425-080 is the FDOT Standard Plan for Utility Conflicts Thru Drainage Structures, part of Series 425 (Structures). The sections below are extracted from FDOT's Standard Plans Instructions (SPI) for this index — design criteria, assumptions and limitations, and what your plans must show.
Design Criteria
Design Criteria and Guidance FDOT Design Manual (FDM) ; Drainage Manual (DM) ; Drainage Design Guide (DDG)
Design Assumptions and Limitations
Design Assumptions and Limitations These details are for construction field expediency to resolve utility conflicts that cannot be remedied by relocation. Review the wall section for strength when the conflict structure is round, or there are multiple inlet or outlet pipes. Potable water supply lines should not pass through storm sewer pipe or structures.
However, if conflict with storm drains is unavoidable or unfeasible, comply with Chapter 62-555.314(3) F.A.C. Submit the following information to the Florida Department of Environmental Protection (FDEP) District Administrator For Drinking Water to obtain their approval: a. Plans showing the conflict and proposed conflict structure b.
Justification describing inordinate cost and practical avoidance c. Upon request, Utility Agency Owner (UAO) supporting documentation for cost of relocation or adjustment. See the following website for District FDEP Drinking Water Contacts: https://floridadep.gov/water/source-drinking-water/content/organization-drinking-water- program Do not use sumped conflict manholes unless the system is hydraulically designed to account for the head loss generated if the sump is completely blocked.
Payment
Payment Item number Item Description Unit Measure XXX-XXX-XXX Project Specific Pay Item Unit See the BOE and Specifications for additional information on payment, pay item use and compensation.
What your plans must show
Plan Content Requirements for this index — the SPI's checklist for designers.
- For conflicts determined during design, use the construction shop drawings for structure details.
How PDFDepth uses this index
When a plan set cites Index 425-080, PDFDepth's AI Plan Review cross-references the set against the Plan Content Requirements for the FDOT indexes it cites and flags items that appear to be missing — each with a citation to the sheet. A human reviewer verifies every flag before it counts.
Related indexes in Series 425
- Index 425-001 — Manhole Covers, Frames, Tops, and Supplementary Inlet Details
- Index 425-010 — Structure Bottoms Type J and P
- Index 425-020 — Curb Inlets Types 1-10
- Index 425-021 — Curb Inlet Top Types 5 and 6
- Index 425-022 — Curb Inlet Type 7
- Index 425-023 — Curb Inlet Type 8
- Index 425-024 — Curb Inlet Type 9
- Index 425-025 — Curb Inlet Type 10
Try it yourself — open your plan set in PDFDepth
Review, measure, and check plan sets against the standards they cite — free for 14 days.
Start for FreeText extracted from FDOT Standard Plans FY 2026-27, a public-domain Florida state publication. Always verify against the current edition at fdot.gov. PDFDepth is not affiliated with FDOT.