FDOT Standard Plans Index 460-470: Series Traffic Railing - (Thrie - Beam Retrofit)

Short answer

Index 460-470 is the FDOT Standard Plan for Series Traffic Railing - (Thrie - Beam Retrofit), part of Series 460 (Structures). The sections below are extracted from FDOT's Standard Plans Instructions (SPI) for this index — design criteria, assumptions and limitations, and what your plans must show.

Design Criteria

Design Criteria NCHRP Report 350 , Test Level 4; AASHTO LRFD Bridge Design Specifications , 6th Edition, Section 13; Structures Design Guidelines ( SDG )

Design Assumptions and Limitations

Design Assumptions and Limitations Index 460 - 470 is the lead standard for the Traffic Railing (Thrie - Beam Retrofit) standard series which includes Indexes 460 - 470 through 460 - 476. Use this standard with Indexes 536 - 0 02, 460 - 471, 460 - 472, 460 - 473, 460 - 474, 460 - 475 and 460 - 476. The Traffic Railing (Thrie - Beam Retrofit) Indexes 460 - 470 through 460 - 476, are applicable for retrofitting specific types of existing bridge mounted traffic railings (a.k.a.

concrete handrails) that are not based on crash tested designs. Indexes 460 - 470 through 460 - 476 are not acceptable as alternatives for new construction. These Standards are to be used in conjunction with Index 536 - 0 02.

The appropriate Index 536 - 0 02 approach transition retrofit for Index 460 - 470 Series bridge railing retrofits must be selected and specified in the plans based on the shapes and designs of the existing bridge traffic railings, approach slabs and end bent wing walls. See the Instructions for Index 536 - 0 02 and SDG 6.7 for more information. The applicability of the Thrie - Beam Retrofit to a particular bridge shall be determined based on a review of the Load Rating of the existing bridge, a comparison of the existing bridge geometry to that shown for the Thrie - Beam Retrofit and an evaluation of the structural adequacy of the existing bridge deck and wing walls in accordance with the requirements of the SDG .

See SDG 2.2 for average weight per linear foot of the retrofit. The Traffic Railing (Thrie - Beam Retrofit) is based on a design that has been successfully crash tested in accordance with NCHRP Report 350 Test Level 4 criteria. The Standards all utilize 10 Gauge Thrie - Beam Guardrail that is installed adjacent to the face of the existing curb and in front of, or in place of, all or part of the existing traffic railing.

The Standards work with existing traff ic railings that incorporate either solid concrete parapet type or concrete post and beam type railings with or withou t top mounted metal railings. These existing traffic railings are typically mounted on top of concrete curbs of varying widths and heights. The individual Standards address both narrow and wide curbs (a.k.a.

"safety curbs"), and skewed and non - skewed bridg es with parallel, perpendicular, angled or flared end bent wing walls. Each Standard includes several schemes that address the given wing wall configurations. Examples depicting existing curb and end bent wing wall configurations are shown in the Existing Curb Schematics and the Partial Plan Views of Existing Bridges herein.

Generally, the Roadway Plans shall include all of the sheets necessary to define and detail the retrofit of the existing traffic railings. Index 460 - 470, Traffic Railing (Thrie - Beam Retrofit) Typical Details & Notes shall be referenced in the Roadway Plans, or a similar project specific drawing depicting general notes and details , shall be included in Standard Plan s Instructions Topic No. 625 - 010 - 003 Index 460 - 470 Series Traffic Railing - (Thrie - Beam Retrofit) the Roadway Plans.

In addition, one or more of the appropriate Indexes 460 - 471 through 460 - 476, that most closely matches the configuration of the existing traffic railing and curb is to be referenced in the Roadway Plans for each bridge as required. Generally, these Standards can be used without any modifications being made to them. More than o ne of the Indexes 460 - 471 through 460 - 476 may be required for a single bridge due to the curbs or sidewalks on the two sides of the bridge possibly having different widths.

A separate Plan and Elevation sheet of the type used in Structures Plans is generally not required. The heights of the exposed portions of the existing bridge curbs may vary and shall be determined by field measurement. These Indexes are applicable for bridges with exposed curb heights from 5" to 1' - 0".

…

Payment

Payment for the removal of all or part of the existing traffic railing shall be included in Removal of Existing Structures, Pay Item 110 - 3. As part of the overall retrofit concept for a bridge, the existing traffic railing may be removed, even though it is not specifically required to be, in order to reduce the dead l oad carried by the bridge. In these cases, the potential drop off hazard for pedestrians that will be created behind the retrofit shall be addressed in the Plans.

Where scuppers exist on bridge decks, project specific notes or details may be required to maintain scupper openings and avoid anchor bolt conflicts. The treatment of the approach end of the retrofit shall consist of Index 536 - 0 02 or another appropriate site specific treatment. The appropriate treatment of the trailing end of the retrofit shall be determined by the Roadway Engineer.

As a minimum, if no other hazards are present, an Index 536 - 00 1 , W - Thrie Beam Transition Section a T railing Anchorage shall be provided on the trailing end of the retrofit . On approach ends, a Transition Block or Curb is required if the existing Approach Slab does not have a curb. A Transition Block is not required on trailing ends with no opposing traffic; however, a Curb may be required due to drainage needs.

An Index 520 - 00 1 , Type D Concrete Curb is generally suitable for this application. The appropriate site specific approach and trailing end treatments shall be shown in the Plans. Indexes 536 - 0 02 and 460 - 470 through 460 - 476 shall be supplemented as required with project specific details that may be deemed necessary to complete the installation of the retrofit.

These details may include locations and details of any existing utilities, conduits, drainage structures (includi ng scuppers), sign structures and luminaire supports, and/or any other needed information not included in these Standards. In the event that the designs and details presented in the Indexes do not closely match the existing Standard Plan s Instructions Topic No. 625 - 010 - 003 Index 460 - 470 Series Traffic Railing - (Thrie - Beam Retrofit) conditions, the Structures and/or Roadway Engineer(s) shall prepare a customized project specific retrofit design based on the crash tested bridge railing and guardrail transition designs presented in Indexes 536 - 0 02 and 460 - 470 through 460 - 476 as guides.

Contact the Structures Design Office and Roadway Design Office for guidance in this event. The Structures Engineer shall evaluate the thermal movements of the existing bridge using the following criteria and shall identify the locations in the Plans (if any are required) where a Thrie - Beam Expansion Section is to be included in the guardrail. If the total thermal movement at an individual bridge deck expansion joint is 1½" (¾" in each direction) or less, the Thrie - Beam Guardrail shall span the joint without the use of an expansion section.

If the total thermal movement at an individual bridge dec k expansion joint exceeds 1½", a Thrie - Beam Expansion Section must be installed at that location. The total amount of thermal movement at bridge deck expansion joints shall be determined by theoretical calculation and confirmed by field measurements where possible. It should be noted that the actual in - service movement due to thermal effects may be less than the value determined by theoretical calculation.

The Utility Adjustment Plans, if required, shall contain all necessary utility adjustment information required for the construction of the retrofit. Utilities and/or conduits may exist in or adjacent to the existing traffic railings and will vary in size, number and location. The presence, size, number and locations of existing utilities and/or conduits shall be determined by a review of existing Plans and confirmed by field verification.

It should be noted that utility and/or conduit installations may vary by location on a single bridge. …

What your plans must show

Plan Content Requirements for this index — the SPI's checklist for designers.

  • The appropriate Index number and Scheme number shall be shown in the Roadway Plans for each bridge along with the limiting stations of the retrofit. The appropriate post designation of "A", "B" or "C" shall be determined and shown in the Plans for each bri dge based on the criteria given in the Post Dimension Table on Index 460
  • 470. The selection of the appropriate post shall consider any proposed milling and resurfacing work. The limiting stations or overall length of the retrofit for each bridge shall also be shown. An example of a note containing the required information as it would appear on a Plan or Plan
  • - Profile sheet is as follows: "Construct Traffic Railing (Thrie
  • - Beam Retrofit), Index 460
  • - 4 7X, Scheme X, from Sta. XX+XX.XX (at or near Begin Bridge) to Sta. XX+XX.XX (at or near End Bridge). On left side of bridge utilize Post "X". On right side of bridge utilize Post "X". See Standard Plan s Index 460
  • - 470 for post details." If the same height post can be used on both sides of the bridge, a single post designation is all that is required. For projects with multiple bridges, a tabular format may be used to convey the necessary information. A separate Plan and Elevation sheet of the type used in Structures Plans is generally not required. Payment Item number Item Description Unit Measure 460
  • - 1 Metal Traffic Railing, Thrie Beam Retrofit LF 110
  • - 6 * Removal of Existing Structures LF * As required per the Design Assumptions and Limitations. Example Quantity Calculations The following examples cover the three general cases for quantity calculations for the length of payment along each side of a bridge: CASE I
  • - 474 Scheme 2 and Indexes 460
  • - Beam Retrofit) extends close to the end of the wing wall or parallel curb on the approach slab. CASE II
  • - 476 Scheme 1 and Indexes 460
  • - Beam Retrofit) extends close to the end of the bridge deck.
  • Standard Plan s Instructions Topic No. 625
  • - 470 Series Traffic Railing
  • - 476 Schemes 3 and 4 and Index 460
  • - Beam Retrofit) extends far enough along the flared curb until the Special Steel Guardrail Post can be located on the approach slab. In the following examples, it is assumed that the trailing end treatment is the same as the approach end treatment. For Case III, Indexes 460
  • - 476 Schemes 3 and 4, different trailing end treatments usually give an error of less than one foot for each side of the bridge. Different trailing end treatments for Case III, Index 460
  • - 474 Scheme 3 may give an error of ± 3'
  • Standard Plan s Instructions Topic No. 625
  • - 470 Series Traffic Railing
postaccordanceastmguardrailboltsanchorsanchorspacingnutsthriebeambridge

How PDFDepth uses this index

When a plan set cites Index 460-470, PDFDepth's AI Plan Review cross-references the set against the Plan Content Requirements for the FDOT indexes it cites and flags items that appear to be missing — each with a citation to the sheet. A human reviewer verifies every flag before it counts.

Related indexes in Series 460

All FDOT Standard Plans indexes

Try it yourself — open your plan set in PDFDepth