Skip to content

FDOT Standard Plans · FY 2026-27 · Series 520: Incidental Construction

FDOT Standard Plans Index 520-005: Concrete Shoulder Gutter Spillway

Short answer

Index 520-005 is the FDOT Standard Plan for Concrete Shoulder Gutter Spillway, part of Series 520 (Incidental Construction). The sections below are extracted from FDOT's Standard Plans Instructions (SPI) for this index — design criteria, assumptions and limitations, and what your plans must show.

Design Criteria

Design Criteria FDOT Design Manual (FDM) ; Drainage Manual (DM)

Design Assumptions and Limitations

Design Assumptions and Limitations Use in conjunction with Shoulder Gutter where inlets, pipes and endwalls are not practical.

Payment

Payment Item number Item Description Unit Measure 520-6 Concrete Shoulder Gutter LF See the BOE and Specification 520 for additional information on payment, pay item use and compensation.

What your plans must show

Plan Content Requirements for this index — the SPI's checklist for designers.

  • If spillway empties into an unpaved ditch, the detail should be modified and included in the Plans.
variesconcreteshoulderincidentalditchswalerevisiongutterspillwaydescriptionlastline

How PDFDepth uses this index

When a plan set cites Index 520-005, PDFDepth's AI Plan Review cross-references the set against the Plan Content Requirements for the FDOT indexes it cites and flags items that appear to be missing — each with a citation to the sheet. A human reviewer verifies every flag before it counts.

Related indexes in Series 520

All FDOT Standard Plans indexes

Try it yourself — open your plan set in PDFDepth

Review, measure, and check plan sets against the standards they cite — free for 14 days.

Start for Free

Text extracted from FDOT Standard Plans FY 2026-27, a public-domain Florida state publication. Always verify against the current edition at fdot.gov. PDFDepth is not affiliated with FDOT.