Index 570-001 is the FDOT Standard Plan for Permanent Erosion Control, part of Series 570 (Incidental Construction). The sections below are extracted from FDOT's Standard Plans Instructions (SPI) for this index — design criteria, assumptions and limitations, and what your plans must show.

Design Criteria

Design Criteria FDOT Design Manual (FDM) ; Drainage Manual (DM) ; Drainage Design Guide (DDG)

Design Assumptions and Limitations

Design Assumptions and Limitations Refer to FDM 210 , FDM 211 , FDM 913 (Typical Sections), and Drainage Manual for guidance on where to include sod or performance turf. Index 570-010 only applies to flush shoulder roadways where minor shoulder rework is needed to maintain a pavement edge drop-off between ½ to 1 inch. For shoulder drop-off soil, assume an average of 250 CY per lane mile of shoulder requiring correction; adjust as necessary based on field conditions and District experience.

Include average CY per lane mile of shoulder amount in the Summary of Earthwork Design Notes column. Cut sod width may vary depending on the project area and how it is cut. Typical sod width for palletized sod is 16” wide and big roll sod sizes range from 36” to 48”.

Specify sod as single width or multiple row widths of the same size of either palletized or rolled sod depending on what is available in the project area and where the sod will be placed on the project. Consideration should be given to adjusting the width of sod shown in the Plans when regional sod production widths are greater than the 2’-8” width shown on Index 570-010 Coordinate with the District Roadway Design Office. Wildflowers destroyed by shoulder sodding and turf operations are to be reestablished under the seeding rates prescribed for permanent wildflower #2 group shown by table in Index 570-001 .

Payment

Payment Item number Item Description Unit Measure 570- 1- 1 Performance Turf (Contractors Option) SY 570- 1- 2 Performance Turf (Sod) SY 570- 13- Shoulder Dropoff Soil, Truck Measure CY See the BOE and Specification 570 for additional information on payment, pay item use and compensation.

What your plans must show

Plan Content Requirements for this index — the SPI's checklist for designers.

  • Include Performance Turf or Sod in the Plans in accordance with the requirements of the Basis of Estimates Manual ( BOE ) and (FDM). Include shoulder and sod width in the Plans. Show limits of sod where different than Roadway Typical Sections or as shown in Standard Plans . Include shoulder slope in the Plans. Indexes 570
shoulderpavementpointwildflowerstriprevisionflushconcretesidewalkseedinggrouptickseed

How PDFDepth uses this index

When a plan set cites Index 570-001, PDFDepth's AI Plan Review cross-references the set against the Plan Content Requirements for the FDOT indexes it cites and flags items that appear to be missing — each with a citation to the sheet. A human reviewer verifies every flag before it counts.

Related indexes in Series 570

All FDOT Standard Plans indexes

Try it yourself — open your plan set in PDFDepth

Review, measure, and check plan sets against the standards they cite — free for 14 days.

Start for Free

Text extracted from FDOT Standard Plans FY 2026-27, a public-domain Florida state publication. Always verify against the current edition at fdot.gov. PDFDepth is not affiliated with FDOT.