FDOT Standard Plans · FY 2026-27 · Series 695: Traffic Control Signals and Devices
FDOT Standard Plans Index 695-001: Traffic Monitoring Site
Short answer
Index 695-001 is the FDOT Standard Plan for Traffic Monitoring Site, part of Series 695 (Traffic Control Signals and Devices). The sections below are extracted from FDOT's Standard Plans Instructions (SPI) for this index — design criteria, assumptions and limitations, and what your plans must show.
Design Criteria
Design Criteria FDOT Design Manual (FDM) FDM 110; Traffic Monitoring Handbook ( TMH )
Payment
Payment Include the pay items for the TMS in Category 0200 - Roadway. Item number Item Description Unit Measure 695-1-A TMS Non-Weight Vehicle Axle Sensor EA 695-2-A TMS Vehicle Non-Intrusive Vehicle Sensor EA 695-3-A TMS Vehicle Speed/Classification Unit EA 695-5-A TMS Solar Power Unit EA 695-6-AB TMS Inductive Loop Assembly EA 695-7-ABC TMS Cabinet (Permanent Site typically uses Type IV, Short Term Sites and Non-Motorized typically uses the Type III) EA 695-8-AB TMS System Communication Modem EA 695-9-AB TMS Vehicle Weigh-In-Motion Axle Sensor EA 695-10-A TMS Weigh-In-Motion Data Collection Unit EA 695-11-A TMS Non-Motorized Data Collection Unit EA 695-12-A TMS Non-Motorized Axle Sensor EA 695-13-A TMS Non-Motorized Infrared Sensor EA 695-14-AB TMS Non-Motorized Inductive Loop Assembly (Diamond Loops) EA 695-15-A TMS Non-Motorized Solar Power Unit EA 695-16-AB TMS Surge Suppressor EA 695-17-A TMS Patch Panel EA Index 695 - 001 Traffic Monitoring Site -A TMS Managed Field Ethernet Switch EA See the BOE and Specification 695 for additional information on payment, pay item use and compensation.
What your plans must show
Plan Content Requirements for this index — the SPI's checklist for designers.
- See FDM Part 9 . Show on the Plan & Profile Sheets the proposed locations for Traffic Monitoring Sites (TMS). Show the loop layout, location of axle sensors, and cabinet locations on the Roadway Plan Sheet. If the scale of the Plan Sheet is too large to detail the site features, use a separate Detail Sheet to detail the features of the TMS.
How PDFDepth uses this index
When a plan set cites Index 695-001, PDFDepth's AI Plan Review cross-references the set against the Plan Content Requirements for the FDOT indexes it cites and flags items that appear to be missing — each with a citation to the sheet. A human reviewer verifies every flag before it counts.
Related indexes in Series 695
- Index 700-010 — Single Column Ground Signs
- Index 700-011 — Single Column Cantilever Ground Mounted Sign
- Index 700-012 — Single Post Sign Support Barrier Side-Mounted
- Index 700-013 — Single Post Sign Support Barrier Top-Mounted
- Index 700-020 — Multi-Column Ground Sign
- Index 700-030 — Wind and Hanger Beams for Overhead Signs
- Index 700-031 — External Lighting for Signs
- Index 700-040 — Cantilever Sign Structure
Try it yourself — open your plan set in PDFDepth
Review, measure, and check plan sets against the standards they cite — free for 14 days.
Start for FreeText extracted from FDOT Standard Plans FY 2026-27, a public-domain Florida state publication. Always verify against the current edition at fdot.gov. PDFDepth is not affiliated with FDOT.